Potential analysis for ground-mounted photovoltaic plants, Pritzwalk

The city of Pritzwalk recorded a high demand for the construction of ground-mounted photovoltaic plants (GMPP) in 2019 and 2020. Due to the existing planning sovereignty, it is the task of the municipality to control the construction of GMPP in terms of planning. In addition, the applications must be examined individually for their advantages and …

Continue reading...

Potential analysis of ground-mounted photovoltaic plants, Luckau

The increasing number of enquiries regarding investment in ground-mounted photovoltaic plants prompted the town of Luckau (Brandenburg) to commission a potential analysis to identify suitable areas for solar energy in the Luckau municipal area. Based on the “Preliminary Recommendation for Action of the Ministry of Agriculture, Environment and Climate Protection to Support Municipal Decisions for …

Continue reading...

Planning approval for 380 kV overhead line Röhrsdorf-Weida-Remptendorf

The grid reinforcement project between the substations Röhrsdorf in Saxony and Remptendorf in Thuringia serves to increase the transmission capacity of electricity in the two federal states. For this purpose, the existing 380 kV overhead line between the substations Röhrsdorf (Chemnitz, Saxony), Weida (Greiz district, Thuringia), and Remptendorf (Saale-Orla district, Thuringia) is to be reinforced …

Continue reading...

SEA-PR for the Berlin Cycling Plan

The Berlin Cycling Plan (Radverkehrsplan or RVP) serves to concretize the goals of the Berlin Mobility Act. Based on the mission statement “More people should ride their bikes. They should be safer on the road and also feel safer.” the RVP formulates strategic goals and action priorities for the development of cycling in the capital. …

Continue reading...

Potential Analysis: Areas for Solar Use, Spremberg

The town of Spremberg | Grodk in Lower Lusatia intends to designate areas as “special construction areas for solar energy” in the future zoning plan (FNP). In the course of the energy transition, suitable areas for solar plants are to be integrated in addition to the existing concentration zones for wind energy. In preparation for …

Continue reading...

Environmental Review of the Land-Use Plan in Michendorf

The aim of the current land-use plan is to integrate and, where required, modify the existing proposals for a land-use plan for the municipality of Michendorf. In the interests of environmental conservation an environmental review was carried out in accordance with paragraph 2 of the Federal Building Code, and the considerable level of anticipated environmental …

Continue reading...

Gravel mining Leegebruch

In extending the Leegebruch SO I mining area belonging to the town of Hohen Neuendorf, plans for another gravel-quarrying field (Leegebruch SO II) are in development. Achieving these ends necessitated, amongst other things, accommodating 2 pre-existing plans for forestation, and redesigning the land-use plans. Alongside procedural support for all three operations, environmental expertise required for …

Continue reading...

Environmental Report GASAG Area

The property owner plans to establish a European Energy Forum (EUREF) on the former GASAG site. The plan includes a new transport connection and a service center building with a maximum utilization of the area. The site is located in the middle of Schöneberg and is characterized by the gasometer as an industrial monument. Environmental …

Continue reading...

Environmental report (land-use plan) in Oranienburg

In the context of an environmental review of the land-use plan for the city of Oranienburg subject to paragraph 2 (4) of the Federal Building Code, the anticipated environmental impact of the plan was determined, described and evaluated in an environmental report. The basis for the evaluation was the description and precise demarcation of the …

Continue reading...